My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00123
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2010 11:49:45 AM
Creation date
10/5/2006 11:36:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153448
Contractor Name
Colorado River Water Conservation District
Contract Type
Grant
Water District
0
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />". <br /> <br />, <br /> <br />TASK NO.: 5 <br />RFP CROSS-REFERENCE: <br />Step 2, Item (l) <br /> <br />STAFF MEMBERS RESPONSIBLE: <br />Hydrologist <br />Water Rights Specialist <br />Irrigation Specialist <br /> <br />TASK TITLE: <br /> <br />Evaluation of Operation of Existing Overland Ditch and Reservoir System. <br /> <br />RATIONALE: <br /> <br />In order to assess the potential opportunities for improved management of <br />the Overland Ditch and Reservoir System, detailed reviews and investigations <br />of all aspects of the existing and historic operations of the system are <br />required; including its present physical charcteristics and conditions, present <br />and past operations, plans for repair or replacement of the dam, and the <br />opinions and needs of the Overland Ditch and Reservoir Company share- <br />holders. <br /> <br />METHODOLOGY: <br /> <br />1. Prepare a vicinity map of the Overland Ditch and Reservoir System area by <br />photo-reduction of 1:21i,OOO scale USGS topographic sheets. <br /> <br />2. Delineate the Overland Ditch and Reservoir System and locate other ditches, <br />reservoirs and gaging stations on the North Fork Gunnison River tributaries <br />intercepted by the Overland system. <br /> <br />3. Compile water rights data, historic streamflow data, diversion records, <br />irrigated acreages, and other physical data required for analyzing the <br />hydrologic operation of the drainage basins intercepted by the Overland <br />system. <br /> <br />Ii. Delineate on the maps an operating model of the hydrological area supplying <br />the Overland Ditch and Reservoir System. <br /> <br />5. Estimate the theoretical consumptive use and irrigation demands for the <br />existing Overland Ditch and Reservoir System utilizing the same methodology <br />described under Subtask 2.8. <br /> <br />6. Make a field reconnaissance of the Overland Ditch and Reservoir System and <br />meet with the District liO Commissioner, Overland Ditch and Reservoir <br />Company officials and shareholders, and Western Engineers to verify in <br />general the locations, areas of use, historic water use, operating conditions of <br />the system, plans for rehabilitation of the reservoir, and other basic data <br />compiled for the evaluation. <br /> <br />7. Evaluate the operation of the existing Overland Ditch and Reservoir to <br />determine the extent available water is utilized and identify opportunities to <br />increase the water utilization through improved management. <br /> <br />II-ll <br /> <br />Revised 9/23/1985 <br />
The URL can be used to link to this page
Your browser does not support the video tag.