<br />We believe the objectives of the study can be accomplished using the <br />available basic data. Our work plan does not include any new data generation <br />efforts which would require substantial commitments of either time or expense, <br />such as installation of stream or diversion gauging stations, geologic foundation <br />drilling or seismic testing. <br />The study will be made for a 27 -year period of water years 1958 to 198/;. <br />This period <7ontains both. the extreme low (1977) and high (J 983) years of record in <br />the study basins, the lowest 3-year drought (1976-1978), and the lowest IO-year <br />drought (l959-1968).lI. <br /> <br />Section 3: The Work Schedule <br /> <br />Figure II-I depicts the planned schedule for the study. The work schedule <br />shown is based on the contract starting date for the study of August 15, 1985. <br />During the last two weeks of August, the scope of work for the study was discussed <br />and refined with the CWCB staff. Work on Steps One and Two of the CWCB study <br />plan will start September 3, 1985 and the approved final report will be delivered to <br />the CWCB by February 3, 1986, resulting in an elapsed time of five and one-half <br />months to complete the study. <br />A tentative schedule of the major study events is as follows: <br /> <br />Study Schedule Milestones <br /> <br />1985 <br /> <br />August 15 <br />August 19 <br />September 3 <br /> <br />Contract starting date <br /> <br />Initiate work on study. <br /> <br />Completion and approval of Inception Report (Task No. 1) and <br />start of work on Task Nos. 2 and 5. <br />Submit written Progress Report No.1. <br />Start of work on Task No. /;. <br /> <br />September 16 <br />October 7 <br /> <br />1.1 According to U.S.B.R. statistical evaluations; see Reference b. above. <br /> <br />1I-3 <br /> <br />Revised 9/23/1985 <br />