Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />A SUMMARY OF FEASIBIliTY ISSUES FOR THE <br />RAW WATER IRRIGATION SYSTEM PROJECT <br />TOWN OF SILT. COLORADO <br /> <br />Introduction <br />At the November 1994 meeting of the Colorado Water Conservation Board (CWCB), <br />the Board recommended the Town of Silt's proposed Raw Water Irrigation System for <br />conditional approval as part of the 1995 Construction Fund authorization with the <br />following conditions: <br /> <br />a, Completion of a feasibility study and a determination that the project is <br />feasible, <br />b. Staff evaluation of the Town's fInancial condition and ability to pay and, <br />c, The Town is unable to obtain project fInancing through the Colorado <br />Water Resources and Power Development Authority, <br /> <br />The purpose of this report is to meet conditions a, and b, A letter from the Water and <br />Power Authority was received by the CWCB staff in July 1995 to meet condition c. <br />