My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00121
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:14 AM
Creation date
10/5/2006 11:36:48 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153702
Contractor Name
Silt, Town of
Contract Type
Loan
Water District
39
County
Garfield
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />, <br /> <br />. <br /> <br />STATPOF COLORADO <br /> <br />o <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br /> <br />721 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone (303) 866,3441 <br />FAX (303) 866-4474 <br /> <br />Roy Romer <br />Governor <br /> <br />MEMORANDUM <br /> <br />James S. Lochhead <br />Executive Director, DNR <br /> <br />FROM: <br /> <br />Chuck Lile G'" <br />Bill Green ~ <br /> <br />Daries C. Lile, P.E. <br />Director, CWCB <br /> <br />TO: <br /> <br />DATE: September II, 1995 <br /> <br />SUBJECT: Town of Silt Raw Water Irrigation System Project <br /> <br />BACKGROUND <br /> <br />At the November 1994 meeting, the Board recommended conditional approval for a $400,000 <br />loan at 4,0 percent for 30 years for the construction of a Raw Water Irrigation System <br />(RWIS) by the Town of Silt. The conditions for final Board approval were: <br /> <br />a. Completion of a feasibility study and a determination that the project is feasible, <br /> <br />b. Staff evaluation of the Town's financial condition and ability to pay and, <br /> <br />c, That the Town is unable to obtain project financing through the Colorado Water <br />Resources & Power Development Authority, <br /> <br />At the July 1995 Board meeting (Agenda Item 23 b,), the staff reported that we were unable <br />to formulate a recommendation at that time and that we were awaiting the submittal of <br />additional information in order to make a final determination of feasibility and to evaluate the <br />Town's financial condition (items a, and b, above of the conditional approval). <br /> <br />A letter from the Water & Power Authority was attached to my July memo to the Board <br />stating that the Town would not be eligible for Authority funding in fulfillment of condition <br />c., above. The Board voted unanimously that the staff continue to work with the applicant on <br />items a, and b, and that the Director be given the authority by the Board to make a final <br />determination of feasibility, <br /> <br />Utilizing information provided by the Town of Silt staff and by the Town's engineering <br />consultant, Jerome Gamba & Associates of GlenwoodSprings, the CWCB staff has completed <br />a detailed analysis of feasibility issues related to the Raw Water Irrigation System project as <br />summarized in the following paragraphs. <br /> <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.