Laserfiche WebLink
<br />I <br />I Chapter Page <br />I 5 CONCLUSIONS AND RECOMMENDATIONS <br /> 5.1 Conclusions 5-1 <br />I A. Rock Creek Dam Site 5-1 <br /> B. Muddy Creek Dam Site 5-1 <br />I C. Seismicity 5-2 <br /> D. Costs 5-2 <br />I 5.2 Recommendations 5-3 <br />I <br /> TABLES <br />I <br /> Table <br />I S-l Project Data - Rock Creek Dam <br />I S-2 Project Data - 11uddy Creek Dam <br />I 3-1 Rock Creek Dam - Alternative Layouts <br /> Preliminary Comparative Costs <br /> 3-2 Rock Creek Dam - Construction Cost Estimate <br />I <br /> 4-1 Muddy Creek Dam - Site C <br />I Preliminary Comparative Costs <br />4-2 Summary of Soil Parameters for Stability Analysis <br />I 4-3 Summary of Results of Stability Analysis <br />4-4 Muddy Creek Dam - Construction Cost Estimate <br />I <br />I <br />I <br />I <br />I iv 6839W <br />