Laserfiche WebLink
<br /> I <br /> I Chapter Page <br /> I 4 HUDDY CREEK "C" DAM AND RESERVOIR (Cont'd.) <br /> 4.3 Geotechnical Investigations 4-6 <br /> I A. Geologic Mapping 4-6 <br /> B. Subsurface Investigation 4-8 <br />, I C. Construction Materials 4-9 <br /> D. Materials Testing 4-11 <br /> I 4.4 Flood Hydrology 4-11 <br /> 4.5 Sedimentation 4-12 <br /> I 4.6 Dam and Appurtenant Design 4-13 <br /> A. Dam Site 4-13 <br /> I B. Diversion 4-14 <br /> C. Dam 4-15 <br /> D. Dam Stabil ity 4-16 <br /> I E. Spillways 4-18 <br /> F. Outlet Works 4-19 <br /> I G. Power Source and Controls 4-20 <br /> 4.7 Access Roads and Relocations 4-20 <br /> I A. Primary Access to Dam 4-20 <br /> B. Secondary Access Roads 4-21 <br /> I C. Modification of U.S. Highway 40 4-21 <br /> D. Relocation of 230-kV Transmission Line 4-22 <br /> 4.8 Construction Planning 4-23 <br /> I A. Materials Sources 4-23 <br /> B. Contractor's Plant and Operations 4-24 <br /> I C. Construction Schedule 4-24 <br /> D. Hanpower Estimates and Labor Sources 4-25 <br /> I 4.9 Construction Cost Estimate 4-25 <br /> A. Basis of Estimate 4-25 <br /> I B. Estimate Detail 4-26 <br /> 4.10 Assessment of Hydropower Potential 4-28 <br /> 4.11 Project Implementation Schedule 4-28 <br /> I <br /> I <br /> I i i i 6839101 <br />