My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153629 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153629 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:25:18 AM
Creation date
10/5/2006 11:36:35 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153629
Contractor Name
Colorado River Water Conservation District, The
Contract Type
Loan
Water District
50
County
Grand
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />24,000 acre-feet was below the minimum capacity to be considered and <br />established the low point on the cost/capacity curve. The high dam at <br />the upstream site was about the highest practical dam that could be fit <br />into the topography without a very long cutoff wall on the left abut- <br />ment ridge. The reservoir capacity of 89,700 acre-feet established the <br />upper bound of the curve. The intermediate height dam was chosen to <br />establish a mid-range on the curve. The downstream site elevations <br />were the same as for the upstream site, so comparable points on the <br />cost/storage curve could be established. <br /> <br />In order to make valid cost comparisons, all RCC dam layouts were as <br />similar as possible. Assumptions made for layout development include: <br /> <br />o Diversion through a conduit embedded in a trench in the lower <br />part of the abutment. The conduit can be used as part of the <br />permanent outlet works. <br /> <br />o Spillway - Ungated ogee section with flip bucket at dam toe <br />sized for a peak probable maximum flood (PMF) discharge. <br /> <br />o Outlet works consisting of an intake structure attached to <br />upstream face of the dam, a conduit passing under dam, and a <br />valve structure at downstream toe. <br /> <br />o Formed conventional concrete facing zone at the upstream face. <br /> <br />o Conventional concrete zone at the downstream face of both <br />spillway and non-overflow section for protection against <br />severe environment formed in steps sloping at 0.75 H : 1.0 V. <br /> <br />2. Rockfi11 Dam - 8ased on past experience with similar projects, <br />it was judged that a rockfil1 or embankment dam at the Rock Creek sites <br />would be more costly than an RCC dam. To confirm this judgment, a pre- <br />liminary layout of a rockfil1 dam was made at the upstream site. A dam <br />and spillway layout that best fit the topography determined the dam <br /> <br />3 - 3 <br /> <br />6819W/502OW <br />
The URL can be used to link to this page
Your browser does not support the video tag.