Laserfiche WebLink
<br />" r'. (. <br /> COST ESTIMATE <br /> Estimated Billing Rate <br />Item Work Item Personnel Hours Rate/Hour Total <br />1- Mobilization & Site Visit R. Hurelbrink 48 $33.52 $ 1, 608 . 96 <br /> R. Quraishi 24 .38.49 923.76 <br />2. Material Investigations Z. Batchko 40 30.85 1 , 233 . 96 <br />3. Geologic Analysis R. Quraishi 40 38.49 1,539.60 <br />4. Dam Analysis Z. Batchko 60 30.85 l,851.00 <br />5. Study Water Rights' R. Hurelbrink 8 33.52 268.l6 <br />6. Operation Studies Y. Au-Yeung 8 48.04 384.32 <br /> J. Kenny 80 25.01 2,000.88 <br />7. Hydrology/Hydraulics J. Kenny 60 25.01 1,500.60 <br />8. Collection System-Diversion A. Kovall 40 38.03 1,521.20 <br />9. Enviromnental D. Bruce 32 22.01 704.32 <br />10. Cost Estimates C. McReynolds 24 40.59 974.l6 <br />11. Benefit Determination R. Hurelbrink 24 33.52 804.48 <br />12. Economic/Financial Analysis D. Bruce 80 22.00 l,760.00 <br />13. Report R. Hurelbrink 44 33.52 1,474.88 <br /> W. Halliday 40 39.40 1 ,57 6.00 <br /> Draftsmen 80 20.80 l,664.00 <br />14. Meetings/Consultations R. Hurelbrink 8 33.52 268.16 <br /> W. Halliday 8 39.40 315.20 <br />15. Quality Control A. Tczap 16 55.47 887.52 <br /> M. Kuehl 8 61. 73 493.84 <br /> Subtotal $23,755.00 <br /> . <br /> <br />DIRECT COSTS: <br /> <br />Backhoe (Work Item 3) <br />Soils Lab Testing <br />Travel: <br /> <br />3 days @ $400/day <br /> <br />$ 1,200.00 <br /> <br />l,OOO.OO <br />480.00 <br />315.00 <br />450.00 <br />800.00 <br /> <br />Air fare <br />Per diem <br />Car <br /> <br />Postage/Reproduction/Miscellaneous <br /> <br />TOTAL <br /> <br />$28,000.00 <br />