Laserfiche WebLink
<br />. <br />'. <br />I <br />. <br />. <br />. <br />I <br />. <br />I <br />,. <br />I <br />. <br />I <br />I <br />I <br />. <br />. <br />I <br />I <br /> <br />Table 1.1 <br />Outline of Scope of Services <br /> <br />I. Field Investigation <br />A. Civil Engineering <br />1. Site Inspection <br />2. Surveying of Dam and Appurtenant Structures <br />3. Drill Hole and Borrow Pit Locations <br />B. Geologic Investigations <br />1. Boreholes through Embankment <br />2. Borrow Area Borings <br />3. Geologic Mapping <br />II. Evaluations <br />A. Civil Engineering <br />1. Hydrology and Flood Routing <br />2. Alternate Spillway Conceptual Design <br />3. Alternate Embankment Conceptual Design <br />4. Rehabilitation Preliminary Design <br />5. Construction Cost Estimate <br />B. Geologic <br />1. Laboratory Testing <br />2. Existing Embankment Stability Analysis <br />3. Seismicity and Design Acceleration Analysis <br />4. Alternate Embankment Designs <br />5. Seepage Analysis <br />6. Borrow Material Evaluation <br />III. Report Preparation <br />A. Preliminary Design Drawings <br />B. CWCB Feasibility Study <br /> <br />9 <br />