My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00116
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:08 AM
Creation date
10/5/2006 11:36:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153477
Contractor Name
Victor, City of
Water District
0
County
Teller
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> I <br />I I <br /> I 3 Stripping CY 2,210 $ 3 $ 6,630 <br /> 4 Excavation CY 4,830 $ 3 $ 14,490 <br /> I 5 Embankment CY 29,800 $ 4 $119,200 <br /> 6 Ri prap CY 2,050 $ 55 $112,750 <br /> I 7 Filter Material CY 900 $ 10 $ 9,000 <br /> I 8 Extend 20" Outlet Pipe LF 50 $ 50 $ 2,500 <br /> 9 Rehabilitate Spillway <br /> I Outfall LS LS $ 3,000 $ 3,000 <br /> 10 Cone re te Grade Beam <br /> (Spillway) CY 42 $ 250 $ 10,500 <br /> I 11 Spillway Footbridge LS LS $ 24,000 $ 24,000 <br /> I 12 Refurbi sh Outl et <br /> Structure LS LS $ 1,500 $ 1,500 <br /> 13 Ca twa 1 k to Outl et <br /> I Control s LS LS $ 12,000 $ 12,000 <br /> 14 Protect 12" Wa ter Li ne LS LS $ 1,000 $ 1,000 <br /> I 15 Topsoil CY 2,000 $ 2 $ 4,000 <br /> I 16 Seeding AC 2 $ 2,500 $ 5,000 <br /> 17 Erosion Control Netting SY 5,000 $ 2 $ 10,000 <br /> I Construction Cost $387 ~O70 <br /> I The Total Project Cost for the preliminary design is estima ted from normal <br /> project cost items listed below: <br /> I 1. Construction <br /> I 2. Contingency Costs: 20% of Item 1 <br /> 3. Engineering and Construction Service Costs: 12% of Items 1 and 2 <br /> I A contingency of 20% of the estimated construction cost is included to cover <br /> incidental and anticipated costs. Engineering costs include fi na 1 engineering <br /> I 4 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.