My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C152718 Feasibilty Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C152718 Feasibilty Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:07 AM
Creation date
10/5/2006 11:36:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153718
Contractor Name
Morgan County Quality Water District
Contract Type
Loan
Water District
0
County
Morgan
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION TWO <br />STIJDY OBJECTIVE <br /> <br />GENERAL <br />The District presently obtains it's water supply from three separate well fields which are <br />described in subsequent sections. The water from all three fields is of excellent quality and, <br />barring unexpected emergencies, suitable for long term use. All fields consist of shallow sandy <br />aquifers which are vulnerable to swface contamination <br /> <br />The District would suffer a significant breakdown if anyone of the three sources of supply <br />were for any reason lost. It is the objective of this study to detennine the feasibility of <br />importing Carter Lake Water as an emergency supply that could replace water from any of the <br />existing supplies should future conditions so require. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.