My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00110
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2010 9:23:47 AM
Creation date
10/5/2006 11:36:14 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153491
Contractor Name
Upper Yampa Water Conservancy District
Contract Type
Loan
Water District
0
County
Routt
Bill Number
HB 83-1102
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />� <br />� <br />(h) The Diatrict ahall require each owner of Excess Landa to <br />irr��yy� <br />certify the extent of hia or her total ownerahip and the number of of <br />Exceas Lands. Each owner who by acquisition of additional land becomes an <br />Excess Landa owner or increases an existing Excess Landa ownership or who has <br />disposed of all or part of auch Excess Lands'held in said ownership ahall <br />ptomptly make similar certification. On or before January 30 of the year in <br />� <br />� � .� <br />which the first payment is due and each January 30 thereafter, the District <br />shall submit a written report to the Contracting Officer showing the total <br />acreage of Excess Lands held at any time during the preceding calendar year and <br />the total acreage of lands capable of receiving irrigation benefits. Upon <br />receipt and approval of said report, the Contracting Officer will notify the <br />District of any charges due in accordance with subarticle (f)� herein. <br />(i) The District may at any time prepay all or any part of loan <br />funds advanced under this contract, or, after establishment of the loan <br />obligaCion, and upon approval of the Codtracting Officer, all or any part of the <br />loan obligation; Provided, That all acc[ued interest ig paid at the same time; <br />Provided, further, That such prepayments shall be in addition to any and all <br />other annual installments required hereSn. Prepayment of the irrigation <br />obligation may be made; Prov ed, owever, That acreage limitation laws, <br />� <br />particularily the Reclamation R m Act of 1982 (RRA), are being enforced <br />and prepayment is not being ; ed to c rEumvent acreage limitation laws. <br />(j) Whenever the emergency reserve fund exceeds the basic amount <br />specified in Article 19, the excess annual reserve fund deposit not required <br />shall be applied each year toward accelerated repayment of the District's <br />obligation undet this contact. <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.