My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00107
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:58 AM
Creation date
10/5/2006 11:36:08 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153730
Contractor Name
Bravo Ditch Company
Contract Type
Loan
Water District
64
County
Logan
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The Selected Project <br /> <br />The company has decided to rebuild the concrete portion of the <br />diversion to a narrower width of 60 feet. A preliminary layout <br />and design is shown in Appendix B. (Construction plans are also <br />included in the file pocket of this study,) <br /> <br />The project involves driving sheet piling into the river sand to <br />support the new concrete wing-wall, and to protect the entire <br />structure. The new wing-wall will be doweled into the existing <br />structure and made part of it. A sand dam will be constructed <br />between the wing wall and the north bank of the river, <br /> <br />Water Rights <br /> <br />The BDC has water rights to allow diversion form the South Platte <br />River, The State Engineer's Office (SEO) annual diversion <br />records for BDC for years 1993, 1994, and 1995 show 5731.8 ac-ft, <br />6244.85 ac-ft, and 4827.44 ac-ft diverted respectively, The SEO <br />Diversion records for the Farmer's Ditch, 1995, show total <br />diversions of 1643.53 ac-ft. The SEO records are shown in <br />Appendix C, <br /> <br />Cost Estimate <br /> <br />The selected alternative is estimated to cost a total of $43,221. <br />The planning and design costs will be primarily absorbed by the <br />NRCS. The detailed construction cost estimate is provided in <br />Appendix B. <br /> <br />Feasibility of the Repair of the <br />Bravo Ditch Company Diversion <br />June 15, 1996 <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.