My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00107
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:58 AM
Creation date
10/5/2006 11:36:08 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153730
Contractor Name
Bravo Ditch Company
Contract Type
Loan
Water District
64
County
Logan
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Implementation Schedule <br /> <br />The following schedule is proposed for implementation of the <br />project: <br /> <br />Task <br /> <br />Tarqet Completion Date <br /> <br />1. <br />2 , <br />3 , <br />4, <br />5 . <br />6 , <br /> <br />Complete Final Design <br />Bid the Job <br />Award the Bid <br />Start Construction <br />Complete Construction <br />Project is Operational <br /> <br />7/1/96 <br />8/1/96 <br />8/20/96 <br />9/3/96 <br />10/1/96 <br />10/15/96 <br /> <br />Social, Economic, and Physical Impacts <br /> <br />The project will have no significant social impacts, <br /> <br />The project will have a positive economic impact by providing <br />irrigation water for 990 acres of shareholders' crops, and by <br />providing water for the Farmers Ditch, which also receives water <br />through the BDC diversion. <br /> <br />The project will have no significant physical impacts once <br />construction is complete. The new structure will be very similar <br />to the previous structure. <br /> <br />Permitting <br /> <br />All easements and rights of way are now held by the company. No <br />permits will be required for this repair project, <br /> <br />The company is exempt from 404 permitting by Statutory exemption, <br />33 CFR Section 323.4(a)3, (repair of an existing diversion <br />structure. ) <br /> <br />The company believes no Environmental Assessment (EA) or <br />Environmental Impact Statement (EIS) will be required. <br /> <br />Financial Plan <br /> <br />Sources of financing for the project consist of a grant from the <br />United States Department of Agriculture (Farm Services Agency) in <br />maximum amount of $38,110 at a 50% cost share ratio, The FSA <br />approval letter, and letter of project time extension, is found <br />in Appendix D, The remaining 50% of the project will be funded <br />by a loan from the Colorado Water Conservation Board (CWCB), The <br /> <br />Feasibility of the Repair of the <br />Bravo Ditch Company Diversion <br />June 15, 1996 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.