My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00106
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:06 AM
Creation date
10/5/2006 11:35:59 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153494
Contractor Name
Loveland, City of
Water District
0
County
Larimer
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE 3-1 <br /> <br />SUMMARY OF AVERAGE YATER SUPPLIES USED HNDER DESIGN CONDITIONSa <br />(Existing System) <br /> <br />Supply Source <br /> <br />Diverted Directly <br />to Demand <br />(AFY) <br /> <br />Diverted to <br />Storage <br />(AFY) <br /> <br />Released From <br />Storage to <br />Demand <br />(AFY) <br /> <br />Direct-Flow Rights <br /> <br />3,789 <br /> <br />o <br /> <br />Transfer Decree Rights <br /> <br />6,409 <br /> <br />326 <br /> <br />42c <br /> <br />CBT <br /> <br />9,420 <br /> <br />Yindy Gap <br /> <br />1,168 <br /> <br />Green Ridge Glade <br /> <br />119 <br /> <br />Total to Demand <br /> <br />20,786 <br /> <br />161 <br /> <br />a <br />All values are in acre-feet/year, averaged over 1,OOO-year simulation. <br />b Storage capacity of existing system is 600 ac-ft at Green Ridge Glade. <br />c 13 percent of amount diverted must be used or released each winter. <br /> <br />3-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.