Laserfiche WebLink
<br />-----~------------- <br /> <br />TABlE 4 <br /> <br />ElJAUJATI(l'I OF AL'lImATIVES <br />SlH1ARY OF RFSUI:l'S <br /> <br />Alternative <br /> <br />Defici t <br />Reduction <br />(AF) <br /> <br />ElIa:gencya <br />Supply <br />(11 days) <br /> <br />Transferb <br />Ikree <br />Spills <br />(AFY) <br /> <br />T""l.......tation Olsts <br />(1967 dollars) <br />Capi tal ArriJal <br /> <br />No. 1 <br /> <br />Additiooal 1,945 rnr units <br />Addi tiooal 17.5 cis No. 1 water <br /> <br />2,745 <br /> <br />5 <br /> <br />4,312 <br /> <br />$ 5,<B:l,(XX) <br /> <br />$19,900 <br /> <br />I <br />>-' <br />o <br />I <br /> <br />No. 2 <br /> <br />Additiooal 1,645 rnr uni ts <br />Expand Green Ridge Glade Reservoir <br />to 3,500 AF (total capacity) <br /> <br />2,745 <br /> <br />:Yl <br /> <br />2,367 <br /> <br />c <br />9,810,(XX) <br /> <br />57,4OOc <br /> <br />No. 3 <br /> <br />Construct Mai tland Canyon <br />Reservoir to 7,350 AF (total <br />capaci ty) <br /> <br />2, 745d <br /> <br />70 <br /> <br />1,111 <br /> <br />24, 300, (XX) <br /> <br />89 ,(xx) <br /> <br />a Minimn number of days a full Ci ty storage facili ty could II>2et denBffi dur~ water supply aJErgel1CY (\lest Slope <br />b system outage, drought event greater in mgnitude than 100-year drought, etc.). <br />Average annual voltm2 of storable Transfer Decree water left in the stream due to insufficient storage; does not <br />include water left in stream due to Transfer Ikree and Olarles Hansen Feeder Canal capacity coostraints. <br />c \lith Maitland Canyon Reservoir used instead of Green Ridge Glade: capital cost = $20,l00,(XX); annual cost = <br />d $78,900. <br />This alternative would supply a 5 percent increase in City demanl over that specified umer the resign Qn:\itioos. <br />