Laserfiche WebLink
<br />SCHEDULE A <br /> <br />COLORADO WATER CONSERVATION BOARD <br />CONSTRUCTION FUND PROGRAM PROCEDURES <br /> <br />1. Board dpproval of engineering firm dnd engineering <br />agreement between engineering firm dnd project sponsor. <br /> <br />2. Prepdration of detailed plans dnd specifications for <br />authorized projects by consulting engineering firm. <br /> <br />3. Approval of detailed plans and specifications by Board <br />staff (plans dnd specifIcations for storage dams dnd <br />reservoirs must dlso be approved b~ Stdte Engineer's <br />office). <br /> <br />4. BOdrd stdff approval of bidding for the project. BOdrd <br />staff present at bid opening for construction. <br /> <br />5. <br /> <br />Project sponsor may issue the notice of award and the <br />notIce to proceed with construction to tne contractor <br />(both notices must be approved by the Board staff before <br />they are Issued). <br /> <br />Conduct a. pre-construction co'!:~;~~'.(, Approval of <br />constructlon schedule by B:d"~;,rr';t,; <br /> <br />Construction commences. I _Bod~~~~~#ff makes periodic <br />inspections during construc ,t." . ~~;f change orders must <br />be approved by the B drd sta ,.:~}~~Jadvance and before dfly <br />construction on chdn ems. c~Ycommence. Emergency <br />items cleared by tele \.1'",' ~9'" <br /> <br />The consult in eer\(.e~ifles that the project has <br />been compte d in'~ 0 approved drawings dnd <br />specifications rra ges for final inspection. <br /> <br />6, <br /> <br />7. <br /> <br />8, <br /> <br />9. <br /> <br />rinal inspection <br />Board stdff. <br /> <br />dcceptdnce of ds-built project by <br /> <br />10. Submittal of as-built drawings to Board staff for <br />dpproval and filIng. <br /> <br />\ <br />