My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00103
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:06 AM
Creation date
10/5/2006 11:35:56 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C143621
Contractor Name
Manitou Springs, Town of
Water District
0
County
El Paso
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, '. <br /> - <br /> \ <br /> \ <br /> ! <br /> <br />~ . R. W. Beck and Associate. <br /> <br />PART I -.SERVICES <br /> <br />City of Manitou Springs <br /> <br />April 30, 1974 <br /> <br />I. A. General Scope of Services <br /> <br />The general scope of services shall consist of the furnishing <br />of consulting engineering services by R. W. Beck and Associates <br />(Consulting Engineer) to the City of Manitou Springs (City) for a study <br />of the City's existing water supply and distribution system and the <br />development of a plan of improvements and additions that are needed <br />to be made to the system for adequa.te and reliable service to the <br />customers served by the system. <br /> <br />I. B. Services to be Furnished by the Consulting Engineer <br /> <br />The services to be furnished by the Consulting Engineer shall <br />be as described below. <br /> <br />I. B. 1 - Feasibility Study and Report. - The Consulting <br />Engineer shall proceed immediately to prepare a feasibility study and <br />report on improvements and additions proposed to be made to the City's <br />water system including a water filtration facility and treated water <br />storage. In addition, the study of the City's water distribution system <br />may also dictate certain other improvements and betterments to the <br />system in order to provide adequate and reliable water service to the <br />customers served by the system. <br /> <br />As appropriate, the study and report will be made along the <br />lines as set forth in the March 18, 1974, draft of the "General Require- <br />ments for F.ea~ibility Reports - Applications for Financial Assistance <br />from Water 'Projects Construction Fund" as prepared by the Colorado <br />Water Conservation Board. <br /> <br />The study and report shall include the following areas of <br />investigation and review: <br /> <br />a. A review of the existing system, and adequacy thereof to <br />, serve, the City's current a.nd projected water consumption <br />requiremen ts. <br /> <br />~ <br /> <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.