Laserfiche WebLink
<br />'. <br /> <br />, , <br /> <br />", <br /> <br />" , <br /> <br />.'~-" <br /> <br />STUDY TEAM AND MANPDHER REQU I REMENTS <br /> <br />"- <br />Project M~ager for the feasibility study will be Kenneth A. <br />Mangelson, Ph.D.) P.E. He will be assisted, as necessary, by the staff <br />engineers, Jon Kidder and Ruth Yeager. The professional resumes for these <br />team members are included for your review. <br /> <br />The estimated manpower requirements for the feasibility study are as <br />follows: ' <br /> <br />TECHNICAL MANPOWER REQUIREMENTS <br />FUCHS DAM FEASIBILITY STUDY <br />(Manhours) <br /> <br />Work Task <br /> <br />PM <br /> <br />Engr, <br />10 <br />10 <br /> <br />Tech. <br /> <br />Clerical <br /> <br />A. Data Collection & Coordination <br /> <br />20 <br />5 <br /> <br />10 <br /> <br />B. Hydro! ogy & Hydraul ics <br /> <br />5 <br /> <br />c. Prcject Alternatives & <br />Prel iminary Design <br /> <br />15 <br />10 <br />20 <br />70 <br /> <br />D. Eccnomic Evaluation <br /> <br />30 <br />15 <br />15 <br />80 <br /> <br />20 <br /> <br />E. Fecsibil ity Report <br /> <br />10 <br /> <br />30 <br />40 <br /> <br />TOTALS <br /> <br />35 <br /> <br />Besed upon the above manpower estimate, and including approximately <br />$600.CO for direct costs such as mileage, telephone, reproduction, etc., <br />the tetal enginaering cost for the feasibil ity study is approximately <br />$B,4DO.DO. A current bill ing rate schedul e is incl uded for your ' <br />information. <br /> <br />-3- <br />