My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00102
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2010 3:02:48 PM
Creation date
10/5/2006 11:35:54 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153442
Contractor Name
Fuchs Ranches, Inc.
Contract Type
Loan
Water District
20
County
Rio Grande
Bill Number
HB 83-1102
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br /> <br />, , <br /> <br />", <br /> <br />" , <br /> <br />.'~-" <br /> <br />STUDY TEAM AND MANPDHER REQU I REMENTS <br /> <br />"- <br />Project M~ager for the feasibility study will be Kenneth A. <br />Mangelson, Ph.D.) P.E. He will be assisted, as necessary, by the staff <br />engineers, Jon Kidder and Ruth Yeager. The professional resumes for these <br />team members are included for your review. <br /> <br />The estimated manpower requirements for the feasibility study are as <br />follows: ' <br /> <br />TECHNICAL MANPOWER REQUIREMENTS <br />FUCHS DAM FEASIBILITY STUDY <br />(Manhours) <br /> <br />Work Task <br /> <br />PM <br /> <br />Engr, <br />10 <br />10 <br /> <br />Tech. <br /> <br />Clerical <br /> <br />A. Data Collection & Coordination <br /> <br />20 <br />5 <br /> <br />10 <br /> <br />B. Hydro! ogy & Hydraul ics <br /> <br />5 <br /> <br />c. Prcject Alternatives & <br />Prel iminary Design <br /> <br />15 <br />10 <br />20 <br />70 <br /> <br />D. Eccnomic Evaluation <br /> <br />30 <br />15 <br />15 <br />80 <br /> <br />20 <br /> <br />E. Fecsibil ity Report <br /> <br />10 <br /> <br />30 <br />40 <br /> <br />TOTALS <br /> <br />35 <br /> <br />Besed upon the above manpower estimate, and including approximately <br />$600.CO for direct costs such as mileage, telephone, reproduction, etc., <br />the tetal enginaering cost for the feasibil ity study is approximately <br />$B,4DO.DO. A current bill ing rate schedul e is incl uded for your ' <br />information. <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.