My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00102
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2010 3:02:48 PM
Creation date
10/5/2006 11:35:54 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153442
Contractor Name
Fuchs Ranches, Inc.
Contract Type
Loan
Water District
20
County
Rio Grande
Bill Number
HB 83-1102
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C. Project Alternatives and Preliminary Design <br /> <br />This phase tiill include an evaluation of alternatives and the develop- <br />ment of the project development plan. Included will be the prcl iminary <br />design of the recommended spillway alternative. <br /> <br />Also included in this work task will be evaluation of the slide area <br />near the spillr/ay" channel to determine alternatives for repairing Clod sta- <br />bilizing the slide. <br /> <br />o. Economic Evaluation <br /> <br />. -~!.. - <br /> <br />This work task will include an estimate of costs of construction of <br />the reconmended improvements to the dam, spillway and slide are~, and an <br />evaluation of economic realities of the project. The ability of Fuchs <br />Ranches to reimburse CHCB for construction funds also will be determined. <br /> <br />E. Feasibility Report <br /> <br />A f23sibi1ity report on the Fuchs Dam improvements will be prepared <br />and will ~resent information on the following items: <br /> <br />I. General Information <br /> <br />II. Owner's Financial Status and Assets <br /> <br />III. Proj~ct Water and Water Rights <br /> <br />IV. Project Plan and Preliminary Design <br /> <br />A. General <br />B. Spillway <br />C. Spi 1 ]"ay Channel <br />D. Sl ide <br /> <br />V. Economic Evaluation <br /> <br />A. Construction Costs <br />B. Operation and Maintenance Costs <br />C. Repayment Schedul e_ <br /> <br />VI. Summary - Project Evaluation and Financial Programs <br /> <br />Fifteen copies of the feasibility report will be provided to the CWCB <br />and the Owners of the dam, Fuchs Ranches, Inc. <br /> <br />-2- <br /> <br />.'C. <br /> <br />\ <br />\ <br />I <br />! <br />
The URL can be used to link to this page
Your browser does not support the video tag.