My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00098
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:06 AM
Creation date
10/5/2006 11:35:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153140
Contractor Name
Fruita, City of
Contract Type
Grant
Water District
0
County
Mesa
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r. <br />( <br /> <br />. <br /> <br />Section VII Evaluation of Alternatives: Eac:h of the alternatives will be <br />evaluated in terms of re1iabi1it~, capitol cost, long term <br />operating and maintenance costs, flexibility, water quality, <br />and requi red instituti ona 1 arrangements. Based on thi s <br />evaluation, a recommended alternative will be selected. <br />Project Engineer 24 HI's. <br />Drafting 4 HI's. <br />Secretary 4 HI's. <br /> <br />Section VIII Financial Program: A proposed I'epayment schedule showing how <br />the recorranended alternative costs can be repaid and the required <br />water rates will be prepared bas,ed on input from the Colorado <br />Water Conservation Board. This schedule will include debt <br />retirement, interest payment, operating cost, emergency operating <br />fund, other water department cos.t, and a suggested water rate <br />required to meet these expenses. <br />Project Engineer 24 HI's. <br />Secretary 4 HI's. <br /> <br />Final Report, Project Management, and Decision/Input Program: A bound report <br />containing the above outlined plan of study c:ontents will be printed with <br />appropriate maps and exhibits. Fifteen copies of the final report will be <br />submitted to the Water Board and ten copies to the Town of Fruita. The <br />completed study will meet the water planning needs of the Town of Fruita and <br />provide the Board of Trustees with information on which to base the decisions <br />concerning the Town and its water. Project management will include preparing <br />for and attending public information meetings. as well as overall coordination <br />of the project. <br /> <br />Project Manager <br />Secretary <br />Printing & Binding <br />Travel Expenses <br /> <br />72 HI's. <br />8 HI's. <br />$750,00 <br />250.00 <br /> <br />SUMMARY <br /> <br />Labor <br /> <br />Project Manager <br />Project Engineer <br />Drafting <br />Secretary <br /> <br />72 Hrs. <br />334 Hrs. <br />84 Hrs. <br />88 Hrs. <br /> <br />Expenses <br /> <br />Laboratory Analysis <br />Printi ng <br />Travel <br /> <br />$ 500.00 <br />750.00 <br />250.00 <br /> <br />PROJECT FEE <br /> <br />Total lump sum project fee for the abOVE! described scope of work will be <br />$11 ,873.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.