Laserfiche WebLink
<br />. <br /> <br />, <br /> <br />. <br /> <br />BUDGET <br /> <br />GROUND WATER RECHARGE AND MANAGEMENT PROJECT <br />FOR <br />SAN LUIS VALLEY WATER CONSERVANCY DISTRICT <br /> <br />Estimated costs for the respective items listed in the outline <br />are included in the following tabulation. It has been assumed that <br />one major recharge pit would be constructed, a pit near the Monte <br />Vista National Wildlife Refuge would be completed and cooperation <br />of owners of five existing pits would be obtained. <br /> <br />Outline <br />Item Description Unit Quantity Unit Cost Total Cost <br />LA. Land acquisition Acres 100 200 20,000 <br /> Construction of pits 1. s. 1 5,000 5,000 <br />LB. Cooperative agreements ea. 5 500 2,500 <br />I.C. Construction of pit 1. s. 1 1,000 1,000* <br />II.A. Monitoring wells ea. 10 1,000 10,000 <br /> Measuring wells** hrs. 160 35 5,600 <br /> Travel mi. 1,500 0.50 750 <br />II.B. Measuring devices ea. 7 2,000 14,000 <br />II.C. Engineering 1. s. 1 11,150 11,150 <br />III.A. Data collection 1.s. 1 5,000 5,00P <br />III.B. Data collection 1. s. 1 5,000 5,000 <br /> -- <br />IV. Engineering 1.5. 1 10,000 10,000 <br /> ESTIMATED TOTAL COST $90,000 <br /> <br />l.s. - Lump sum. <br />ea. - Each <br />mL - mile <br />hrs. - hours <br />* - County has offered to construct pit in exchange for gravel. <br />** - Assumed measurement of wells requires one day per week for 20 <br />weeks. It is assumed measurement of flow to pits can be accom- <br />plished on same day that wells are measured. <br /> <br />4 <br />