My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00096
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:06 AM
Creation date
10/5/2006 11:35:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153494
Contractor Name
Loveland, City of
Water District
0
County
Larimer
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />j' <br /> <br />~ <br />. - <br />, <br /> <br />t <br /> <br />. <br />MEMOMNDUM <br /> <br />'- <br /> <br />COLORADO WATER CONSERVATION HOARD <br />J. William McDonald <br />Director <br /> <br />TO: The Loveland Water Study File <br />FROM: aill Green <br /> <br />DATE: August I, 1988 <br /> <br />SUBJECT: Study Status <br /> <br />Backqround <br /> <br />The City of Loveland and th~ CWCB are conducting a <br />three-phase analysis of the CitY's raw water supply system: <br /> <br />Phase 1 - An assessment of 8rought impacts on the City's <br />raw water supply system and a recommendation for a <br />drought-protection level for design of facilities. <br />Completed in August 1986. <br /> <br />Phase 11 - Development and evaluation of alternatives over <br />a 30-year planning horizon to provide raw water capacity <br />adequate for the 100-year drought event. Completed in <br />January 1988. <br /> <br />Phase III - Detailed feasibility study for one selected raw <br />storage alternative. postponed indefinitely. <br /> <br />StudY Status <br /> <br />The work on the study has been done under two contacts with <br />the City of Loveland. The first contract for the Phase I study <br />amounted to $18,552.50 and was paid out in October 1986. The <br />second con c Phases II and II of the study is in the <br />amount 0 8,402.50 To date, we have paid the City <br />$41.041. 0 on the cond contract. The contract completion <br />date was D r I, 1987. Thus. the contract will have to be <br />amended if work should someday resume on the study. <br /> <br />In discussing the contracts with Dick Leffler. Chief <br />Engineer for the City. he informed me that the City has spent a <br />total of $31.105 for Phase I and $88.458 for Phase II. <br /> <br />6 ~ ~OZ. t5t <br />4~ <br />~ <br /> <br />7821E <br />
The URL can be used to link to this page
Your browser does not support the video tag.