My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00096
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:06 AM
Creation date
10/5/2006 11:35:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153494
Contractor Name
Loveland, City of
Water District
0
County
Larimer
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />"" <br /> <br />" <br /> <br />, <br /> <br />. <br /> <br />. <br /> <br />PHASE III - TASK 3: VATER <br /> <br />TASK DESCRIPTION: Development of the total water requirements of the City <br />versus the total water supply available to address water <br />utilization and water quality. <br /> <br />TASK OBJECTIVE: <br /> <br />1. To define the average, maximum day, maximum hour, and the daily, <br />weekly, monthly, and annual water demands of the City. <br /> <br />2. To define water losses in the proposed water system from point of <br />diversion to point of delivery. <br /> <br />3. To provide a tabulation of water diversion requirements developed <br />by combining water demands and system losses. <br /> <br />4. To evaluate various sources of surface water and list effective <br />water rights. <br /> <br />5. To show the amounts of surface water available to the project. <br /> <br />6. To define the quality of the surface water supplies. <br /> <br />HETBODOLOGY: <br /> <br />CDM will work with City staff and incorporate pertinent <br />data from the Phase II study to evaluate the above water <br />supply/demands issues. System loss and water quality <br />data will be developed in conjunction with City staff. <br /> <br />DELIVERABLES: <br /> <br />1. An acre-foot tabulation of available water supply will be <br />presented for all sources of water owned by the City to meet the <br />Design Condition. These include: the Big Thompson River, the <br />Colorado Big Thompson Project, and the Windy Gap Project. (Since <br />either site is an off-stream reservoir, the fish and wildlife <br />benefits from controls on a particular waterway are non-existent, <br />they will neither be claimed nor evaluated.) <br /> <br />2. No ground water supplies will be evaluated for this portion of the <br />project. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.