My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00096
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:06 AM
Creation date
10/5/2006 11:35:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153494
Contractor Name
Loveland, City of
Water District
0
County
Larimer
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />:. <br /> <br />., <br /> <br />. <br /> <br />. <br /> <br />'" <br /> <br />Ditch <br /> <br />No. of Shares <br />Owned by the City <br /> <br />No. of Shares <br />Representing <br />100% Ownership <br /> <br />Home Supply <br />South Side <br />Louden <br />George Rist <br />Barnes <br />Chubbuck <br />Big Thompson <br />Farmers <br />Greeley-Loveland Co. <br />Seven Lakes <br />Lake Loveland <br />Ryan Gulch <br />Rist and Goss <br /> <br />400 <br />260 <br />340 <br />170 <br />1974 <br />1300 <br />19 <br />20 <br />130 <br />130 <br />65 <br />25 <br />3 <br /> <br />2001 <br />265 <br />600 <br />200 <br />2012.5 <br />1590 <br />21.5 <br />30 <br />1636 <br />400 <br />300 <br />100 <br />3 <br /> <br />Silver Lake (a.k.a. Cemetery Lake) is privately owned and is not included <br />in this Plan of Study. <br /> <br />As with the Phase II study, the term Design Condition will refer to the <br />above set of demand and supply conditions and evaluations of the water <br />supply surplus or deficit corresponding to the 100-year recurrence <br />interval. <br /> <br />An overview of the Plan of Study for Phase III and a description of the <br />specific study tasks that will be performed are presented in the following <br />sections. The study tasks describe the work which will be developed in <br />accordance with CYCB's guidance document for preparation of feasibility <br />reports. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.