Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br /> <br />o <br /> <br />~ <br /> <br />. <br /> <br />. <br /> <br />" <br /> <br />PHASE II - TASK 11: REVIEV ALTERNA- <br />TIVES AND COMPLETE INTERIM REPORT <br />(Cont. ) <br /> <br />3. <br /> <br />CDM wi 11 <br />City's <br />Interim <br />review. <br /> <br />conduct a technical review (at which the <br />participation is encouraged) of the <br />Report prior to release for general <br /> <br />4. The completed Interim Report will be delivered to <br />the City and presented at a public hearing four <br />weeks after the delivery. The hearing will <br />provide the general public with the opportunity <br />to comment on the Phase II study results. <br /> <br />5. In the event that the City determines a need for <br />further analysis, based on either their review of <br />the study results or comments received at the <br />public hearing, additional multi-element <br />alternatives could be formulated. Additional <br />multi-element alternatives would be evaluated in <br />the same manner as described in Tasks 8 through <br />10. The Interim Report would be updated to <br />include the results of the additional evaluation, <br />with the results presented to the public at a <br />second hearing. The reformulation and evaluation <br />of new alternatives, including subsequent report <br />revisions and the second public hearing, will be <br />considered as additional work. <br /> <br />TASK DELIVERABLES: <br /> <br />The completed Interim Report, including discussions <br />and results of Tasks 2 through 10, will be provided <br />to the City four weeks prior to its presentation at a <br />public hearing; 33 copies of the report will be <br />provided (3 copies go to CVCB). <br /> <br />3-27 <br />