My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00096
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:06 AM
Creation date
10/5/2006 11:35:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153494
Contractor Name
Loveland, City of
Water District
0
County
Larimer
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />o <br /> <br />. <br /> <br />. <br /> <br />2. Environmental impacts: The impacts on vegetation, wildlife, and <br />fisheries that would accompany implementation of an alternative. <br />The analysis of environmental impacts will be conducted at a level <br />of detail sufficient to identify potential "fatal flaws" that may <br />present significant environmental obstacles to project <br />implementation. <br /> <br />2.5 <br /> <br />RECOMMENDATIONS AND REPORTS <br /> <br />Based on the results of the Evaluation of Alternatives task, a drought <br />mitigation alternative will be recommended to the City to meet its water <br />demands through the year 2015 at the designated protection level. <br /> <br />An Interim Report which summarizes the results of Tasks 2 through 10 will <br />be prepared. This report will include data concerning yield, cost and <br />social/environmental impacts of all viable single and multi-element <br />alternatives and will be made available four weeks prior to a public <br />hearing at which the report will be presented. Prior to releasing the <br />report for review by the City and the CYCB, a technical review will be <br />conducted by COM; participation in this technical review by the City and <br />the Colorado Yater Conservation Board (CYCB) is encouraged. <br /> <br />Following the public hearing, a final report of the Phase II study findings <br />will be produced for the City. The report will include descriptions of the <br />methodologies used in each task and present the results obtained in both a <br />narrative and tabular/graphical format. An executive summary will be <br />included which briefly presents the study's findings, conclusions, and <br />recommendations. The final report will be presented by COM to the Loveland <br />Yater Board and/or City Council. <br /> <br />If the City decides that reformulation of alternatives and further analyses <br />are necessary, the Interim Report would be updated to include the <br />additional results obtained and would be presented at a second public <br />hearing prior to generation of a final report. The efforts required to <br />perform the reformulations, re-e~aluations, report revisions, and second <br />hearing will be considered as additional work to this Plan of Study. <br /> <br />2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.