My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00096
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:06 AM
Creation date
10/5/2006 11:35:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153494
Contractor Name
Loveland, City of
Water District
0
County
Larimer
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I ~ <br />, <br />c <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br /> <br />. <br /> <br />. <br /> <br />relocated, the number of people to be relocated and the total acreage to be <br />acquired. The relative importance of the social issues will be determined <br />by City staff, the Loveland Vater Board, and City Council. <br /> <br />2.3 FORMULATION OF ALTERNATIVES <br /> <br />It is our intent throughout the Phase II study to identify and analyze <br />various Plan Elements (see 2.2) and to use only those Plan Elements as a <br />base for the formulation of multi-element alternatives. The results of the <br />Plan Element evaluations will provide an assessment of the yield, cost, and <br />potential social/environmental impacts for each individual element. CDM <br />will review these results to develop a set of three (3) preliminary <br />multi-element alternatives. These preliminary alternatives and the results <br />of the Plan Element evaluations will be discussed in a joint meeting with <br />City, State, and CDM staff to formulate the 3 multi-element alternatives to <br />be evaluated in Tasks 8 through 10. <br /> <br />Examples of multi-element alternatives might correspond to the following: <br /> <br />1. Minimum Storage - In this alternative, the potential expansion or <br />construction of storage facilities would be limited in size to <br />that necessary to provide protection against a disruption in the <br />CBT delivery system and to provide an operational pool to insure <br />full utilization of CBT water. <br /> <br />2. Maximize Use of Big Thompson Vater Rights and Vindy Gap Vater - In <br />this alternative, reservoir expansion and/or construction would be <br />sized to (1) allow storage of all city-owned ditch water during <br />those periods when the availability of such water exceeded demand, <br />and (2) to maximize the yield from the City's ownership in Vindy <br />Gap. <br /> <br />3. Minimum Social/Environmental Impacts - An alternative would be <br />formulated to minimize land acquisition, road relocation, and <br />social/environmental impacts. <br /> <br />These alternatives are presented as examples only; the three alternatives <br />to be evaluated in this study will be formulated in the meeting discussed <br />above. <br /> <br />2-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.