Laserfiche WebLink
<br />, , <br /> <br />. <br /> <br />. <br /> <br />,. <br /> <br />/ 5. <br /> <br />Select a power plant size for this study based on preliminary analysis of site conditions future <br />power demand, price projections and transmission line capacity, as described above, <br /> <br />/ 6, <br /> <br />V 7, <br /> <br />Develop a preliminary cost estimate based upon the concept of diversion, storage and generating <br />facilities which would be associated with the selected hydropower plant size. <br /> <br />Develop a preliminary cash flow analysis based on projected revenues, operation costs and ~ <br />amortization of estimated construction costs. J <br /> <br />.j 8. <br /> <br />Incorporate the San Miguel Canyon Project into Task 7 of the SMWCD feasibility study as an <br />element of one or two of the four project configurations to be designated therein. <br /> <br />PRODUCTS: <br /> <br />Phase 1 will provide the following products: <br /> <br />1. A review of regional power demand projections. <br /> <br />2. An analysis of estimated peaking power demand, projected available transmission capacity, and <br />projected prices between producer and wholesale distributor. ~ CMJ 1"; cteJ ~ <br /> <br />3. A preliminary cost estimate for a selected hydropower installation. <br /> <br />4, A preliminary cash flow analysis with the recommended plant size. j <br />