My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00090
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:06 AM
Creation date
10/5/2006 11:35:17 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0015X
Contractor Name
Powderhorn Metropolitan District No. 1 and No. 2
Contract Type
Loan
Water District
0
County
Mesa
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The project schedule anticipates that access to the site during the Winter and Spring <br />months will not allow for reasonable access or work. This will be due to snow conditions, <br />temperatures, and drainage through the site. Because additional field engineering, <br />including drilling test holes is yet anticipated for project design and related requirements <br />for construction documents, it is assumed that final design and construction documents <br />will be delayed. Because ofthe limited construction period due to weather conditions, etc., <br />project construction for the major work on the dam and related structures will occur in <br />1998. This will allow construction to occur during good weather conditions which will <br />not require extensive and expensive procedures to accomplish the required project <br />construction. <br /> <br />A detailed Project Cost Estimate has been prepared and is included in Exhibit F. The <br />following summarizes the project estimate. <br /> <br />OPINION OF PROBABLE COST FOR <br />CONSTRUCTION OF ROBBINS RESERVOIR PROJECT <br /> <br />1) <br /> <br />Dam - Earthwork, Grading, Spillway, <br />Clearing, Restoration and Seeding <br /> <br />$229,450.00 <br /> <br />2) <br /> <br />Rip- Rap <br /> <br />119,250.00 <br /> <br />3) <br /> <br />Outlet Facilities <br /> <br />44,250.00 <br /> <br />4) <br /> <br />Access RoadIMobilizationlDemobilization <br /> <br />37,750.00 <br /> <br />5) <br /> <br />Mesa Creek to Beaver Creek <br />Water Transfer Supply Pipeline <br /> <br />100,000.00 <br /> <br />6) <br /> <br />Engineering Design, Construction Documents <br />Bidding, and Legal <br /> <br />52,500.00 <br /> <br />7) <br /> <br />Project Representation, Construction Staking, <br />and Material Testing <br /> <br />50,000.00 <br /> <br />8) <br /> <br />Contingency <br /> <br />$ 66.800.00 <br /> <br />Total <br /> <br />$700,000.00 <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.