My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153719 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153719 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:31:50 AM
Creation date
10/5/2006 11:35:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153719
Contractor Name
Johnstown, Town of
Contract Type
Loan
Water District
13
County
Larimer
Weld
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />· Rip-rap Johnstown Reservoir Banks <br /> <br />Johnstown may, at some future date, request an expansion in scope to cover these items. If an <br />expansion is requested, a formal feasibility study meeting CWCB requirements will be submitted. <br />This feasibility study will include all appropriate financial analyses. <br /> <br />4.0 REf'ERENCES <br /> <br />Anderson-Rasmussen-Derr, P.C., Certified Public Accountants (ARD). 1993. Town of Johnstown, <br />Colorado Financial Report. December 31. <br /> <br />ARD. 1994. Town of Johnstown, Colorado Firumcial Report. December 31. <br /> <br />ARD. 1995. Town of Johnstown, Colorado Firumcial Report. December 31. <br /> <br />Camp Dresser & McKee, Incorporated (CDM). 1991. Final Report - Town of Johnstown Water <br />Rights Transfer Report. April. <br /> <br />Colorado Water Conservation Board (CWCB). 1993. Memorandum Regarding Agenda Item 9b, <br />November 9-10, 1993, Board Meeting -- Town of Johnstown, Approval of a Construction <br />Fund Loan in Amount of $3.06 Million to Construct a Raw Water Pipeline. To Members, <br />CWCB. October 29 (Updated November 12). <br /> <br />CWCB. 1994a. Water Project Construction Loan Program, Guidelines for Financial Assistance <br />through the Colorado Water Conservation Board Construction Fund. Revised August. <br /> <br />CWCB. 1994b. Colorado Water Conservation Board Feasibility Study Checklist. September. <br /> <br />CWCB. 1996a. Memorandum to the Town of Johnstown File Regarding Johnstown Feasibility <br />Study. June II. <br /> <br />CWCB. 1996b. Letter to Mr. Ed Hill, Town Manager of Town of Johnstown Regarding Pipeline <br />and Pump Station Project. Undated. <br /> <br />Dougherty, Dawkins, Strand & Bigelow, Incorporated (DDSB). 1995. Proposal Presented to Town <br />of Johnstown, Colorado for Investment Banking Services. February 17. <br /> <br />PRC Environmental Management, Inc (PRC). 1993. Raw Water Pipeline Feasibility Study, <br />Johnstown, Colorado. July 29. <br /> <br />PRC. 1996. Raw Water Improvements Cost Opinion Technical Memorandum. August 6. <br /> <br />RBD Incorporated Engineering Consultants (RBD). 1984. Master Plan Update, Water System <br />Improvements, Johnstown, Colorado. July. <br /> <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.