My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153719 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153719 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:31:50 AM
Creation date
10/5/2006 11:35:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153719
Contractor Name
Johnstown, Town of
Contract Type
Loan
Water District
13
County
Larimer
Weld
Bill Number
SB 94-029
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />This would increase the average annual water bill for the average customer from $406 <br />to $586. The average customer monthly rate would increase from $34 to $49. The <br />burden would be felt but would be manageable. <br /> <br />Comment 10. The Board's concern regarding the economic impact of the possible closing of the <br />Golden Technologies plant and the impact this closing would have upon the Town's <br />ability to repay the loan has not been responded to. <br /> <br />Response: Please refer to the response to comment 9. <br /> <br />Comment 11. Copies of the Town's three most recent filUmcial statements should be provided in <br /> <br /> <br />conjunction with an updated feasilJility study. if the Town has established a water <br /> <br /> <br />system "enterprise", the revenues and expenditures for the "enterprise" need to be <br /> <br /> <br />specified for the number of years tfze "enterprise" has been in operation or at least for <br /> <br /> <br />the last three years. <br /> <br />Response: Financial statements for the fiscal years ending in 1993, 1994, and 1995 are attached <br />to this compendium as Appendix A. Johnstown has established a water system <br />enterprise (OOSB 1995; ARD 1993; ARD 1994; ARD 1995). Revenues and <br />expenditures for the Water Works Operations Fund are reported separately in each <br />years' statement (page 26 in 1993, page 25 in 1994, and page 25 in 1995). <br /> <br />3.0 FUTURE RAW WATER IMPROVEMENT PROJECTS <br /> <br />There are several other raw water improvement projects which would enhance the operational <br /> <br /> <br />efficiency of the raw water delivery system, raw water storage system, and water treatment plant <br /> <br /> <br />when completed. These projects are summarized in the report titled Raw Water Improvements Cost <br /> <br /> <br />Opinion Technical Memorandum (PRC 1996). The projects, in order of priority, are: <br /> <br />· Retrofit of existing clarifier with a dissolved air flotation (OAF) unit <br />· Replace Johnstown Reservoir Pumps and Pipeline <br />· Refurbish/replace Johnstown Reservoir Inlet and Outlet <br />· Restore Johnstown Reservoir Storage Capacity <br /> <br />;24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.