Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />D. Description of the Selected Project: <br /> <br />1. Water Rights: The Project will allow for the diversion of water from East Elk Creek in <br />the amount equal to the Town's current water rights plus those being transferred to the <br />Town by the developer of Castle Valley Ranch as part of an augmentation plan prepared <br />with the development of Castle Valley Ranch. <br /> <br />2. Preliminary Design and Layout is shown in general on Map 2 of Appendix B. <br /> <br />3. The narrative description of the project is as follows: The project is a pipeline, 16 <br />inches in diameter, 3835 feet in length, and having a capacity of 1200 gpm The pipeline <br />starts at the headworks of the pre-sedimentation pond ~ar the point of diversion on East <br />Elk Creek. The pipeline will follow its existing alignment from the pre-sedimentation <br />pond to the water treatment plant. In addition to the raw water pipeline, the <br />pre-sedimentaion pond will be upgraded to accommodated proper pre-treatment for 1200 <br />gpm :flows. Upgrades include replacement of the headworks to the raw water line. <br /> <br />5. Cost Estimates: <br /> <br />Planning costs: These costs are considered in the cost of the <br />project as follows .......... $2000 <br /> <br />, Design Costs: The Town's engineer is doing the design at costs <br />estimated as follows.......$1 0,000 <br /> <br />Construction Costs: The construction cost estimate was provided <br />1.... ..1..~ 'T'O"-'~ ~.,a;""eer and is' "ho--- fro Appero'diX,' - 4 $3"'''' ^^^ <br />uy UlC J. wu;:>> Cl-cu. ' '::il Wll ul H........ """,VVV <br />Construction Cont_ingencies................................................ .$1 0,000 <br /> <br />Construction Engineering...... ....... ...... .................................$1 0,000 <br /> <br />TotaL.. ............................ ......... .... ..................... ........ ..... ..5355,000 <br /> <br />O,M&R Costs are estimated at $1,000 per year. <br /> <br />6. Implementation Schedule <br /> <br />Complete Final Design <br />Bid the Job <br />Bid Opening <br />Start Construction <br />Complete Construction <br />Project is Operational <br /> <br />3/1/96 <br />4/1/96 <br />4/1/96 <br />4/15/96 <br />5/15/96 <br />5/16/96 <br />