My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00073
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:05 AM
Creation date
10/5/2006 11:34:03 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153583
Contractor Name
Ute Water Conservancy District
Water District
0
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />~ <br /> <br />. <br /> <br />. <br /> <br />) <br /> <br />Gary Brierlev. P.E. . Tunnel Alternative. Team Leader <br /> <br />Dr. Gary Brierley is a civil engineer with more than 20 years of experience in the design and <br />construction of tunnels. Specifically, Dr, Brierley has participated in the planning, layout, design, <br />cost estimating, and construction management of more than 50 different tunneling projects in many <br />different types of ground and for many different purposes including water supply, waste water <br />removal, irrigation, drainage, and miscellaneous applications. Dr. Brierley will personally oversee <br />and direct BLI's work on the Plateau Creek pipeline study, <br /> <br />Behzad Mirzavi. P.E. . PiDeline Alternative. Team Leader <br /> <br />Mr. Behzad Mirzayi will act as the project engineer in charge of pipeline engineering evaluation <br />aspects of this project. Mr. Mirzayi has over 10 years experience in civil and geotechnical <br />engineering and has recent experience in routing, engineering, and environmental evaluation of <br />pipeline projects for major water delivery systems and/or water and waste water treatment facilities. <br />He has recently complete several main water delivery system engineering evaluation for Denver <br />water Board and a major utility system upgrade for the Rocky Flats Facility, Mr. Mirzayi also has <br />extensive experience with Colorado Department of Highways. He acted as project manager for site <br />investigation and foundation design for more than 50 bridges in Colorado. A list of some of the <br />relevant past projects is included below: <br /> <br />. Conduit No. 99, 2 miles of 12-inch treated water main pipeline routed through city of <br />Denver streets; <br /> <br />. Cottonwood Drainage System, 2.5 miles of drainage pipe network for Cottonwood 10 <br />subdivision; <br /> <br />. Highlands Ranch Water Treatment Facility, design evaluation and construction management <br />of pipelines, water treatment structures, holding ponds, impoundment embankments and <br />roadways; <br /> <br />. Lone Tree Waste Water Treatment Facility, design evaluation of pipe lines, waste water <br />treatment structures, rapid infiltration basins, groundwater evaluation, and groundwater <br />quality determination; <br /> <br />. Metro 1, Sewage Pipeline, engineering evaluation of approximately 5 miles of 24.inch <br />sewage pipeline from Denver Airport to Metro 1 Facility; and <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.