My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00069
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:05 AM
Creation date
10/5/2006 11:33:55 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153169
Contractor Name
Upper Yampa Water Conservancy District
Contract Type
Grant
Water District
0
County
Routt
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ 0, . <br /> <br />. <br /> <br />. <br /> <br />.' <br /> <br />YANCOLO (OSl' ESTIMATE <br /> <br />Re: Perform Exploratory Drilling and Establish Movement Momitoring <br />Points. <br /> <br />1. Establish water table monitoring wells: <br /> <br />Auger drill rig and operator, <br />24 hrs/$35.00/hr.---------------------------- <br />Mobilization and demobilization------------------- <br />Provide permanent protection for holes, <br />8 hrs/$15.00/hr.--------------:-------------- <br />Log Holes, 24 hours/$25.00/hr.-----------------c-- <br />Pipe and miscellaneous supplies------------------- <br />Subsistence--------------------------------------- <br />Subtotal---------- <br /> <br />2. Drill and log core holes and conduct <br />percolation tests: <br /> <br />core drilling rig and operator, <br />90 hours/$75.00/hr.-------------------------- $ <br />Mobilization and Demobilization------------------- <br />Log IIoles, 90 hours/$25.00------------------------ <br />Provide permanen'c protection for holes, <br />8 hrs/$15.00/hr. ----------------------------- <br />Subsistence--------------------------------------- <br />Pipe and miscellaneous supplies------------------- <br />Report preparation, 30 hours/$25.00--------------- <br />Subtotal---------- <br /> <br />. 3. Establish Movement Monitoring Points: <br /> <br />3-man survey crew, 40 hours/$36.00/hr.------------ $ <br />Travel expenses----------------------------------- <br />Subsistence--------------------------------------- <br />Miscellaneous supplies---------------------------- <br />Subtotal---------- $ <br /> <br />$ 840:00 <br /> 200.00 <br /> 120.00 <br /> 600.00 <br /> 150.00 <br /> 200.00 <br />$ 2,110.00 <br /> <br />6,750.00 <br />450.00 <br />2,2:'0.00 <br /> <br />t20.UU <br />600.00 <br />500.00 <br />750.00 <br />$11,420.00 <br /> <br />1,440.00 <br />80.00 <br />450.00 <br />50.00 <br />2,020.00 <br /> <br />TOTAL------------- $15,550.00 <br /> <br />. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.