Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Units &Cost: 100 hours@ $15. OO/hr. This includes travel and interview time. <br /> <br />TOTAL COST: $1,500.00. FUNDING SOURCE: $1,500.00 (CWCB) <br /> <br />TASK 2: Conduct reconnaissance review of stream Segment 1 below Terrace Reservoir to the <br />Gunbarrel Road. Conduct field survey of stream in Segment 2 <br /> <br />The Reconnaissance Review will include: <br />1). An assessment of the reach from the outlet of Terrace Reservoir downstream to the crossing <br />of Gun barrel Road will be conducted to identify geomorphological problems which may have <br />adverse impacts on the reaches downstream on the proposed restoration sites and on the stream <br />stabilization features to be installed in the restoration sites. Two hydrologists will walk the 7-8 <br />mile stretch, photograph, document, and make recommendations regarding any problems and <br />proposed mitigation of those problems and prepare a Stream Reach Reconnaissance <br />Assessment <br />Report. <br /> <br />Product: Stream reach reconnaissance assessment report. <br />Units & Cost: (Based on Wildland Hydrology and Black Creek Hydrology ,LLC) 42 hrs @ <br />$120.00/ hr. (2 persons). <br /> <br />TOTAL COST: $5000.00. FUNDING SOURCE $5000.00 (CWCB) <br /> <br />The field survey will include: <br />2.1). Provide the engineers all required maps of the area along with the Conceptual Plan. <br /> <br />2.2). Develop cross-sections and longitudinal profiles in the field as needed for design and for <br />monitoring. Approximatly 1000 feet apart. (See Goal 5, Objective 2, Task 3.) This information <br />will provide the slope of the stream and river valley. Identify bankfull, and centerline and plot <br />the data on the GIS maps and the current aerial photographs. <br /> <br />2.3). Identify cross sections and mark them on a map and in the field for future monitoring. <br /> <br />2.4). Photo documentation of unstable reaches that can be compiled into the GIS mapping and <br />the monitoring database. <br /> <br />2.5). The ultimate product will be a design plan for the contractors. <br /> <br />Product: Survey. <br />Units &Cost: (Based on Wildland Hydrology and Black Creek Hydrology ,LLC). 167 <br />hours @ $120/hr (2 persons) and one ARWRP person @ $15.00lhr. <br /> <br />TOTAL COST: $17,500.00. FUNDING SOURCE: $17,500.00 (319) <br /> <br />Page -11- <br />