My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00063
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:05 AM
Creation date
10/5/2006 11:33:45 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153533
Contractor Name
Santa Maria Reservoir Company
Contract Type
Loan
Water District
0
County
Hinsdale
Bill Number
SB 88-30
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />G. proaress Re~orts <br /> <br />The ENGINEER shall at all times keep the OWNER apprised of <br />the progress of the feasibility study by providing weekly oral <br />reports to the OWNER'S Project Manager, Mr. Barry Nelson, and <br />written progress reports, detailing the work done and results <br />obtained to date, every two weeks. <br /> <br />SECTION B - SCHEDULE OF WORK <br /> <br />The services called for in Section A of this Agreement <br />shall be completed and the report submitted within one hundred <br />(100) calendar days from the date of this Contract. The <br />ENGINEER will complete the feasibility study and submit the same <br />for approval by the OWNER, CWCB, and all state regulatory <br />agencies within one hundred (100) days of the date. of this <br />contract unless otherwise agreed to by both parties. The time <br />for completion will be extended by the OWNER for a reasonable <br />time if completion is delayed due to unforeseeable causes beyond <br />the control and without the fault of negligence of the ENGINEER. <br /> <br />SECTION C - COMPENSATION FOR ENGINEERING SERVICES <br /> <br />1. If the feasibility study and this Agreement are not <br />previously terminated by the O~-R in accordance with Paragraph <br />C.2 or C.3 below, the OWNER shall compensate the ENGINEER for <br />engineering services in a sum not to exceed $67,200.00, allo- <br />cated as follows: Continental Dam: $31,775. Santa Maria Dam; <br />$35,'25. The payments will be made within forty-five ('5) days <br />of receiving 'the invoices. A retention of $11,000.00 will be <br />withheld by the OWN"-R until approval of the final feasibility <br />st1ldy by both the OWNER and the CWCB. <br /> <br />The invoicing schedule is as follows: <br /> <br />Upon signing of the contract _ $ 38,000.00 <br /> <br />Thirty (30) days after signing <br />of 'the contract $ 18,200.00 <br /> <br />Upon approval of report $ 11,000.00 <br /> <br />Invoices will be submitted to The - Santa Maria Reservoir <br />Company with a progress and sta~us report. <br /> <br />2. If in the course of 'the feasibility study it is deter- <br />mined that 'the seepage problem at one of the reservoirs under <br />study may be correc~ed by means of readily available, and rela- <br />tively simple and inexpensive methods, 'then the ,OWNER may ~er- <br /> <br />.."..... <br /> <br />~ <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.