My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00063
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:05 AM
Creation date
10/5/2006 11:33:45 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153533
Contractor Name
Santa Maria Reservoir Company
Contract Type
Loan
Water District
0
County
Hinsdale
Bill Number
SB 88-30
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~- <br /> <br />\ <br /> <br />. <br /> <br />estimated values of crop irrigation incremental yields and <br />penefits from increased system water supplies will pe utilized <br />from previous work performed by The San~a Maria Reservoir <br />company or other published sources. <br /> <br />D. Identification of Seepaae Mechanisms, OVerall Embank- <br />ment Stabilitv, and Repair Methods <br /> <br />The data assembled in parts A and B of the investigation <br />will be used to identify the most probable mechanism causing <br />seepage through the emklankment at the Santa Maria Dam and <br />continental Dam. The analysis will include two-dimensional <br />seepage and stability analysis of representative dam cross <br />sections. Various methods of halting the seepage through the <br />emklankment will be presented. The advantages and disadvantages <br />of each repair method will be discussed in terms of ease of <br />construction, general reliability, and technical benefits. <br /> <br />E. Economic Evaluation <br /> <br />Cost estimates will be prepared for each alternative repair <br />method and where applicable, operation and maintenance costs <br />related to repairs will be completed. The financial benefits of <br />the resulting increased reservoir storage will be presented. <br />Finally, a repayment schedule will be prepared for the most <br />feasible repair methods. <br /> <br />F. Feasibilitv Report Preparation <br /> <br />The feasibility report on the rehabilitation of Santa Maria <br />Dam and continental Dam will be presented according to the <br />following general outline: <br /> <br />I. General Information <br /> <br />II. company organization and Financial status <br /> <br />III. Land Use <br /> <br />IV. water Supply and Requirements <br /> <br />V. Plan of Development <br /> <br />VI. ~conomic Evaluation <br /> <br />VII. S=ary <br /> <br />Ten copies of the feasibility report will be provided, five <br />(5) to the CWCB and five (5) to the Santa Maria Reservoir <br />Company. <br /> <br />~ <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.