My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00060
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:57 AM
Creation date
10/5/2006 11:33:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153721
Contractor Name
Lyons, Town of
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
SB 96-153
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />/Dd, <br /> <br />c, <br /> <br />Town of Lyons <br />Mr. Robert Freeman <br />November 22, 1995 <br /> <br />2 <br /> <br />. <br /> <br />. '- <br /> <br />c. An aDDroved contract must be in blace before the construction work can Droceed. Jan <br />Illian of this office (303-866-3441) \Vill be available to draft the contract after your loan <br />haS received final recommendation. in Jl\DU\lO' 1.996. You should call Jan.as soon as. <br />possible after the January meeting to discuss the contracting procedure, and to initiate: the <br />contract. It usually takes about 3 to 6 months to complete contracting. No CWCB fillrids <br />can be disbursed until the Construction Fund Bill has been signed by the Governor. and <br />your loan contact is signed by all pllrties. <br /> <br />d. You must adhere to the CWCB Desil!Il and Construction Administration Proced'llIes. <br />Please contact Mike Serlet of this office (303-866-3441) before you start design, or bid <br />construction of the project Mike will explain our contractor bidding and bonding <br />requirements, and will make field iIlspections during construction. His inspections will <br />be the basis of monthly pay estimates for disbursements of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Construction Fund :Loan <br />from the Colorado Water Conservation Board. John Van Sciver will continue to work closely <br />with you through the Feasibility and final approval process for your loan. Please call him at any <br />time if you need assistance. <br /> <br />. <br /> <br />Sincerely, <br /> <br />W~~ <br /> <br />William P. Stanton, P.E. <br />Chief, Project Planning and Construction Section <br />Colorado Water Conservation Board <br /> <br />NS:jvs <br /> <br />Attachments: <br /> <br />l. updated Memo I&a.no... <br />2. CWCB Guidelines for Financial Assistanee <br />3. Sample Feasibility Study (and Disk). <br /> <br />cc (wI Attaehment I.): <br />Mr. David L. Harrison, Chairman ewes <br /> <br />cc (w(o Auachmcnts): <br />John Van Saver. CWCB Staff <br />Bill Green. ewes Staff <br />Mike Serlet, CWCB Staff <br />Jan 1Itian. CWCB Staff <br /> <br />. <br /> <br />C:\WPS 11l0HN\I8aNOV96.ltr <br />
The URL can be used to link to this page
Your browser does not support the video tag.