My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00060
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:57 AM
Creation date
10/5/2006 11:33:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153721
Contractor Name
Lyons, Town of
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
SB 96-153
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1-2 <br /> <br />I <br />t <br />I <br />, <br />I <br />, <br />I <br />- <br />I <br />I <br />- <br />I <br />I <br />, <br /> <br />1 <br />I <br />j, <br />I <br />I <br />,I <br /> <br />the staff in addressing performance-limiting factors and identify other improvements. We consid,:r <br />the maximum capacity at the present WTP to be 1.5 MGD. <br /> <br />The distribution system has two pressure zones, roughly defined as 1) downtown and east including <br />Stone Canyon to elevation 5422 and 2) higher lands including Russell Subdivision and Eagle <br />Canyon to elevation 5584. The Apple Valley Road area (outside the town limits) is served but some <br />problems exist at the higher services. Similarly, computer modeling of the system shows that <br />inadequate fire flow capability exists in the north part of down town including Russell Subdivision <br />due mainly to elevation. Fire flows are also insufficient south of the river, due mainly to insufficient <br />pipe sizes and lack oflooped piping networks. The existing storage capacity of 1.35 MG is adequate <br />but close to the requirement. Recommended improvements should be done as soon as practicable: <br />a 12" diameter backbone distribution line downtown, a 1.0 MG (minimum) storage tank south of <br />Lyons Valley Park and a new storage tank above the Russell Subdivision and other minor upgrades. <br />Additionally, the transmission line from the WTP to town should get a through analysis since it :is <br />the only link to existing storage. <br /> <br />Water metering in Lyons is a continuing issue. Ofthe 560 water accounts, about 276 are without <br />meters and billed on a flat rate. Analysis of the water consumption data shows that flat rate <br />customers used 2.7 times as much water as metered customers in 1994, on average. Analysis also <br />showed that they paid less than Y, as much per 1000 gallons. The report develops costs for <br />conversion to metered services, ranging from about $666 to $871 depending upon the program <br />adopted and the difficulty of the installation. When the whole program is considered, including the <br />needed upgrades in meter-reading technology and billing, program cost ranges from $200,000 to <br />$256,000 (1996$). <br /> <br />The current water capital improvements are budgeted at $874,000, These include a reconstructc:d <br />diversion structure and WTP improvements but do not include a meter program as yet. Financial <br />impact analysis shows that the contemplated debt to fund the current improvements is $780,500, <br />or about $61,000 per year. Timing is good because a large bond debt was retired by the water <br />enterprise in November 1995. Operations/maintenance costs will increase accordingly and are <br />allowed for in the budget revisions, Projected OVer a 10-year time line, total estimated cost for each <br />water account is about $36.00 per month. As a result of the preliminary cost analysis and separme <br />work by staff, the Town raised the water rates in March 1996. <br /> <br />In summary, demand on the water system is very likely to increase, requiring planning for additional <br />capital improvements. Treatment capacity after the current improvements will be at (1.2/1,5 = 0.8) <br />80 percent. Master planing should begin soon. It would include a new 1.0 MGD treatment facility, <br />probably in the east part of town and expansion of the distribution/storage system. Planning would <br />include the detailed assessment of raw water supply and deliveries to the points of diversion. The <br />plan would also layout the other improvements, making it easier to discuss the system needs with <br />developers and commercial interests to make an-angements for fair allocation of costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.