My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153808 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153808 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:50:16 PM
Creation date
10/5/2006 11:33:29 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153808
Contractor Name
Arkansas Groundwater Users Association
Contract Type
Loan
Water District
14
County
Pueblo
Bill Number
ARA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Chapter IX - Remaining Augmentation Requirements <br /> <br />The purchase of 1,007 shares of Excelsior Ditch water will, on an average basis, yield approximately <br /> <br /> <br />752 acre-feet of augmentation replacement credits between March and November of each year. <br /> <br /> <br />AGUA's estimated annual future well head replacement requirements are 8,933 acre-feet, of which <br /> <br /> <br />224 acre-feet are on the Arkansas River above Pueblo Reservoir, 713 acre-feet are on Fountain Creek, <br /> <br /> <br />and 7,996 acre-feet are on the Arkansas River below Pueblo Reservoir. The 752 acre-feet of Excelsior <br /> <br /> <br />Ditch water will reduce the total remaining augmentation requirement to 8,181 acre-feet and reduce <br /> <br /> <br />the Arkansas River below Pueblo Reservoir augmentation requirement to 7,244 acre-feet. <br /> <br />Table IX-1 summarizes AGUA's average monthly future replacement requirements on the Arkansas <br /> <br /> <br />River below Pueblo Reservoir and average monthly Excelsior Ditch replacement credits. Comparing <br /> <br /> <br />the monthly replacement credits to the monthly allgmentation requirements in this reach of the <br /> <br /> <br />Arkansas River, shows that on an average basis, all of the Excelsior Ditch credits can be used to reduce <br /> <br /> <br />the augmentation requirements. <br /> <br />-46- <br />
The URL can be used to link to this page
Your browser does not support the video tag.