Laserfiche WebLink
<br />CWCR Construction Fund Loan App\ication <br /> <br />of the tunnel that our consuhants (Rocky Mountain Consuhants) recommend we fix. <br /> <br />Water Right: <br /> <br />CFS. <br /> <br />Average water diverted per year: 15085 acre-feet. <br /> <br />6. Will the acquisition of additional water rights be necessary? NO <br />If YES, please explain. <br /> <br />7. Please list the names and addresses of the Applicants' engineer(s) and attorney(s). <br /> <br />NAMF <br /> <br />AnnRRSS "ncl PHONF <br /> <br />Rocky Mountain Consultants 825 Delaware Ave., Suite 500 Longmont, Colo"8050 I <br /> <br />Bill Fischer Fischer, Brown, and Gunn, P.C. P.O. Box Q Ft. Collins 80522 <br /> <br />8. List any feasibility studies or other investigations that have been completed or are now in progress <br />for the proposed project. Please submit one copy of each completed study with this application. <br /> <br />none <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, ifknown. <br /> <br />Estimated Engineering Costs: $60,000 <br /> <br />Estimated Construction Costs: $ 1,500,000 <br /> <br />Estimated Total Costs: $ 1,560,000 <br /> <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $ (Usually 75% of Estimated Total Costs) <br />Term (length) ofloan: Y""''' (Usually 10, 20, or 30 years) <br /> <br />Interest Rate: % (Please call for our current rates) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is also <br />requested that the project sponsor submit with this application copies of the two most recent annual <br /> <br />1 <br />