My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150052 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150052 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:57 AM
Creation date
10/5/2006 11:33:23 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150052
Contractor Name
Tunnel Water Company, The
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
EIA
Loan Projects - Doc Type
Feasability Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />4. Please provide a brief description of the owner's existing water supply facilities and descn"be <br />any existing operational or maintenance problems" Attach separate sheets if needed, and a <br />map of the service area. The Tunnel Water Co. collects water from the Laramie River <br />drainage north of Chambers Lake and diverts it into the Laramie-Poudre Tunnel. The water <br />enters the Poudre River and flows downstream and again diverted into either the Water <br />Supply and Storage Co. system or the Wmdsor Reservior system. <br /> <br />For existing facilities indicate: <br />Number of shareholders 2 or <br />Current Assessment per share $100.00 <br />Number of acres irrigated 100,000 + <br /> <br />Number of customers served 300 + <br />Number of shares 450 <br /> <br />Part B. - Description ofthe Project <br />1. Name of the project or facility Laramie-Poudre Tunnel <br /> <br />2. Purpose of this loan application. Check one. <br />New project <br />RehabiIitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />Other (describe) <br /> <br />* <br /> <br />3. If the project is for rehabiIitation of an existing reservoir, is the reservoir currently under a storage <br />restriction order from the State Engineer? NO <br /> <br />4. General location of the project. (please include county, and approximate distance and direction <br />from nearest town, as well as legal description, ifknown. <br /> <br />The Tunnel is located in Larimer County. It is approx. 60 miles west of Ft. Collins, Colorado on <br />Highway 14. <br /> <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. <br /> <br />The project will be two fold - first to clear and repair a cave-in and second to repair other sections <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.