<br />ENGINEER'S PRELIMINARY OPINION OF COST
<br />
<br />Phase 1 . Emergency Repair, 5~ MDnths OllraliDn (December 1, 2000 to May 15, 2001)
<br />
<br /> Item Price p", Total
<br /> Linear Foof
<br />Access Road $49,673
<br />..-.-- ...-
<br />Enlarge Portal ,--- ..-,- -, $59,388
<br /> ._.~ " --
<br />PI~~e 2,000 feet of concrete on inver:r, east portal .,".,--- $62.24 $124,480
<br />Provide tl!mporary rail access to weSler" tU","el fe, repairs $100,000 ..
<br /> ....,..,.
<br />Remine limber section, 98 + 50, with steel sets and 5piling, $3,132.72 $78,318
<br />25 LF
<br />..., -.... ..-..
<br />Line 200 LF wit" 5'4" diameter steel pipe. cellular grout $876.14 $178,500
<br />back/ill
<br />--... .,.-- .... . "..-
<br />5hotcrete and bolt 25S feet of bald runnel $525.95 $134,000
<br />'_'m_..".""',..,_~_ '--"-'"'-" ..
<br />Repair concrele..I,ining with, shotcrete, 121 LF $426,97 -.. $51,663
<br />,- ._--..
<br />Excavate muck in, <:aved area, no support, 290 L~_ $791,64 $90,341
<br />"."..-.. .., ..
<br />Excavate and support caved area, steel sets and spiling, 60 $3,602.65 $216,158
<br />~f"a,verage 3.5-foot spacing " .... --"..
<br />Haul off timbers to Chambers Lake $10,000
<br /> -'.'" - ,-
<br />Rebrace limber sections, west, 114 LF $319.73 $36,449
<br /> "'.'"
<br />Brace timber barr~1 secrion,~est, 50 feet "'....',...', $503.33 $25,166 ,-
<br />.. .....-
<br />Remine 42 LF oftimber section, west, install steel ribs $3,739.06 $157,040
<br /> Total Construction Cost $1,311,176
<br /> ..h__.__. -'-."-'
<br /> ... Construction Profit (12'/0) ....- $157,3~..__,_
<br /> .......
<br /> Total Construction $1,468,517
<br /> -_._--
<br />-..-. .... ,~onstrUCtion Related Engineeril1g ---. $140,000
<br /> - Subtotal $1,.60~,5~7__
<br />... _.....-.. n
<br /> 10% Contingency $160.852
<br /> T olal Phase 1 I'l'Oje~1 Costs $1,769,369