Laserfiche WebLink
<br />Station 14+70 to 15+07 <br />Station 19+89 to 19+97 <br /> <br />The work includes instailing the pipe, constructing temporary bulkheads, filling the annulus with cellular cement, <br />contact grouting between the pipe and cellular concrete, conventional void grouting approximately, including <br />hole drilling, approximately 5' above the existing support, and construction of shotcrete transitions and aprons. <br />The work will include approximateiy 200 yards' of cellular concrete, 220 yards' of conventional void grout, and <br />20 yards' of shotcrete. <br /> <br />This item shall be paid for on the following basis: <br /> <br />A. 5.3' Diameter Steel Pipe: Per lineal foot installed and accepted by the Engineer. <br /> <br />8. Cellular Grout in Annulus: Per cubic yard placed and accepted by the Engineer. <br /> <br />C. Conventional Void Grout: <br /> <br />Per hook-up which shall be defined as making all connections to pumps and grout <br />mixers required to inject grout under a specified pressure into a particular grout hole <br />approved by the Engineer. <br /> <br />Per sack of cement injected into grout holes accepted by the Engineer. <br /> <br />'1 <br />il <br />i] <br />, <br /> <br />D. <br /> <br />Shotcrete Transitions and Aprons: Per cubic yard placed and occepted by the Engineer. This <br />item shall be measured per neat dimensions shown on the plans. <br /> <br />,. <br />,I <br />'I <br />:1 <br /> <br />17. REPAIR CONCRETE LINED SECTiONS WITH SHOTCRETE AND GROUT <br /> <br />All equipment, labor, and materials to repair approximately 204 lineal feet of existing concrete liner with <br />shotcrete and grout. The concrete iiner occurs in five sections as follows: <br /> <br />, <br />:1 <br />I <br />I <br />,I <br />, <br /> <br />I <br />'j <br />'I <br />i <br />;1 <br />'I <br /> <br />Station 7 + 93 to 8 + 98 " <br />Station 14+ S1 to 14+ 70 <br />Station 15+07 to 15+38 <br />Station 16+18to 16+41 <br />Station 17 + 06 to 17+ 32 <br /> <br />The work includes placing approximately 56 yards' of shotcrete and approximately 168 yards' of conventional <br />cement void grouting extending 5'above the concrete crown. <br /> <br />This item shall be paid for on the following basis: <br /> <br />A. Per cubic yard of shotcrete placed and accepted by the Engineer. This item will be measured by <br />taking the area covered multiplied by the 3" neat design thickness. <br /> <br />B. Conventional Void Grouting: <br /> <br />" <br /> <br />q <br /> <br />Per hook.up, which shall be defined as making ail connections to pumps and grout <br />mixers required and drilling of any holes required to inject grout under a specified <br />pressure into a particular grout hole approved by the Engineer. <br /> <br />" <br /> <br />Per sack of cement injected into grout holes and accepted by the Engineer. <br /> <br />Section 01025 . Page 6 of 7 <br /> <br />10/00 <br />