My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00054
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:08:45 AM
Creation date
10/5/2006 11:33:16 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153473
Contractor Name
Stewart Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
EO 08-08-86
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. .'~ <br /> <br />~:) <br /> <br />/7" <br />, ,J <br /> <br />MICHAEL L. BROWN <br /> <br />Page Two <br /> <br />The Thompson Creek Project, .for Cyprus Mines Corporation is a major <br />mine, development in Central Idaho. As Project Manager for Hydro- <br />Triad, Ltd., responsibilities included the water related aspects of <br />planning and design. Preliminary planning, final designs and <br />construction drawings and specifications were prepared for: three <br />sediment control dams, each about 50 feet high; a seepage return dam, <br />about 100 feet high; and a water collection and diversion system with <br />a pipeline over 3 miles long. In addi tion, Mr. Brolo71l had respon- <br />sibility for the hydrogeologic investigations and analysis which were <br />used to estimate the rate of seepage from the impoundment to the <br />surrounding environment. <br /> <br />Other projects include: a detailed water balance study of the Colorado <br />River from Granby to Kremmling, Colorado, part of the Windy Gap <br />Project, for the Northern Colorado Water Conservancy District; surface <br />water hydrology and tailings studies for coal companys such as <br />Sheridan Enterprises, Inc., the Rock Castle Company and Mid-Continent <br />Coal Company for their proposed coal mines in Wyoming and Colorado; <br />and hydrology, hydrogeologic and geotechnical engineering investiga- <br />tions for an open pit coal mine near Sanchez, Dominican Republic. <br /> <br />Project Engineer, Dames & Moore. Responsible for schedules, budgets, <br />and technical content of multi-discipline environmental studies, engi- <br />neering evaluations, and construction drawings and specifications. <br /> <br />, Typical projects included: <br /> <br />Environmental Studies <br /> <br />Gasquet Mountain Project for <br />quality studies for a large <br />Crescent City, California. <br /> <br />California Nickel; surface water <br />nickel-cobalt chromium mine near <br /> <br />Crandon Project for Exxon, U.S.A.; surface water studies for a <br />large underground copper mine near Crandon, Wisconsin. <br /> <br />Pitch Project for Homestake Mining; surface water and tailings <br />studies for a uranium mine near Gunnison, Coloraao. <br /> <br />Leucite Hills Project for Rocky Mountain Energy; surface water and <br />alluvial valley floor studies for a coal mine near Rock Springs, <br />Wyoming. <br /> <br />Nine Mile Lake Project for Rocky <br />for environmental reports for <br />Casper, Wyoming. <br /> <br />Mountain Energy; project manager <br />in situ uranium leaching near <br /> <br />Dry Fork Project for Peabody Coal Co.; <br />valley floor studies for a surface <br />Wyoming. <br /> <br />surface water and alluvial <br />coal mine near Gillette, <br />
The URL can be used to link to this page
Your browser does not support the video tag.