My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153795 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153795 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 2:49:25 PM
Creation date
10/5/2006 11:33:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153795
Contractor Name
Farmers Independent Ditch Company
Contract Type
Loan
Water District
2
County
Weld
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />I" <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (3031 866-3441 <br />fAX: (3031 866-4474 <br /> <br />STATE OF COLORADO <br /> <br />- <br /> <br />March 24, 1997 <br /> <br />Roy Romer <br />Governor <br /> <br />James S. Lochhead <br />Executive Director, DNR <br /> <br />Dilries C. lile, P.E. <br />Director, CweB <br /> <br />Mr. Frank Eckhardt Jr, President <br />Farmers Independent <br />Ditch Company <br />21454 CR 33 <br />La Salle, CO 80645-7905 <br /> <br />RE: Reconstruction of a Portion of the Ditch <br />Loan Approval <br /> <br />Dear Mr. Eckhardt, <br /> <br />Concerning your application for a loan from the Construction Fund, I am pleased to inform you <br />the Colorado Water Conservation Board (CWCB)has approved your request for $55,000 from <br />the Small Project Loan Account. It is our understanding these funds will be used to reconstruct <br />a portion of the Farmers Independent Ditch, <br /> <br />The CWCB approved a loan term of 30 years at an interest rate of 3.75%. I have attached a <br />copy of the updated Board memo concerning the Farmers Independent Ditch Company. Please <br />refer to page 3 of that memo and to the section "Action Taken by the CWCB, March 20, 1997". <br /> <br />The Board has approved the loan subject to several conditions: <br /> <br />a. The Farmers Independent Ditch Shareholders must pass a formal resolution. The <br />resolution is required before we can complete the loan contract. A copy of the <br />resolution has been sent to you by Jan IIIian (303-866-3441). Please contact Jan <br />if you have any questions on this matter. <br /> <br />b. You must adhere to the CWCB Guidelines for Financial Assistance. A copy of <br />our Guidelines is attached. <br /> <br />c. A Feasibilitv Study must be completed. The study will be drafted by John Van <br />Sciver (303-866-3441) of this office. John will complete the study, with your <br />assistance, so that the content of the report is in compliance with the Guidelines <br />and statutory requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.