My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00047
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:32:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153490
Contractor Name
Union Avenue Boat Chute 1987
Contract Type
Miscellaneous
Water District
0
County
Arapahoe
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />OBJECTIVES <br /> <br />1-5 <br /> <br />FLOOD HYDRAULICS <br />The layout and design of the boat chute <br />hydrology of the South Platte River so <br />accepted IOO-year floodplain. <br /> <br />will be compatible with the flood <br />as to not adversely impact the <br /> <br />GOOD NAVIGABILITY <br />The objective is to provide a boat chute which has no dangerous hydrauliC <br />conditions which would threaten the safety of a boater having a basic <br />knowledge of, and skill in, whitewater. <br /> <br />RESCUE COMPATIBILITY <br />The layout and design will provide good visibility of, and access to, the <br />chute to enable efficient rescue operations. The design should incorporate <br />trails and gently sloping banks which will allow rescue workers reasonable <br />bank access. A pOOl/drop concept should allow a floater to swim to the <br />bank upon dropping into one of the pools. <br /> <br />STRUCTURAL STABILITY FOR FULL RANGE OF FLOODS <br />The 10o-year flood on the South Platte River at Union Avenue is B,OOO cfs. <br />A t this discharge in the river, as well as for lesser flows, the river <br />by-pass boat chute discharge must be defined. Appropriate design criteria <br />should be selected for the boat chute to minimize boat chute damage such as <br />wash out of large rocks and/or weirs which are permanent features of the <br />structure. The boat chute design will not cause structural damage to the <br />existing system of related facilities. Design criteria selected will also <br />be based on consideration of expected frequency of damage. <br /> <br />ATTRACTIVENESS AND ENVIRONMENTAL ENHANCEMENT <br />Implementation of the boat by-pass facility should provide aesthetic and <br />environmental enhancement of the area. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.