My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00047
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:32:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153490
Contractor Name
Union Avenue Boat Chute 1987
Contract Type
Miscellaneous
Water District
0
County
Arapahoe
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />OBJECTIVES <br /> <br />1-4 <br /> <br />construction, estimated present worth of the operation and maintenance <br /> <br /> <br />costs over a twenty-year period, and comparison of costs versus unquan- <br /> <br />tified tangible benefits. <br /> <br />Operation and maintenance costs fall into three primary categories; <br />routine, annual, and flood-related. Routine maintenance consists of trash <br />pick-up, mowing and weed control, and is performed several times a year. <br />Annual maintenance consists of the repair or replacement of damaged or <br />deteriorating sections of the boating by-pass structures, including debris <br />removal. erosion repair, bank stabilization, and pruning of vegetation, as <br />well as structural repairs. Flood maintenance is best described as damage <br />repair and, as such, will not be estimated but will be addressed under <br />reliability and structural stability. <br /> <br />INSTITUTIONAL FRAMEWORK <br />The ownership, maintenance responsibility and operation of the boat chute <br />will be defined so as to eliminate uncertainties, overlapping and/or <br />undesignated responsibilities. A framework of institutional relationships <br />will be prepared. <br /> <br />RELIABLE HYDRAULICS UNDER A RANGE OF FLOWS <br />The boat chute deSign should provide reliable operation for boaters within <br />pre-selected and reasonably chosen flow ranges. For instance, it will not <br />be satisfactory for a large hazardous standing wave to develop at certain <br />flows, or for currents to stray from the boating path to carry boaters into <br />unplanned obstacles. <br /> <br />It is planned that design would be aimed at providing reasonable boating <br />opportunities for discharges through the chute of at least 50 cfs. At <br />higher flows, the structure components should be free of damage and not be <br />subject to undue siltation. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.