My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00047
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:04 AM
Creation date
10/5/2006 11:32:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153490
Contractor Name
Union Avenue Boat Chute 1987
Contract Type
Miscellaneous
Water District
0
County
Arapahoe
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />WWE <br /> <br />Wright Water Engineers, Inc. <br /> <br />DENVER OFFICE <br />2490 West 26th Ave., Suite 55A <br />Denver, Colorado 80211 <br />(303) 480-1700 <br /> <br />TULSA OFFICE <br />707 South Houston, Suite 302 <br />Tulsa, Oklahoma 74127 <br />(918) 584-7136 <br /> <br />September 21, 19B7 <br /> <br />GlENWOOD SPRINGS OFFICE <br />818 Colorado Avenue <br />P.O. Box 219 <br />Glenwood Springs, Colorado 81602 <br />(3D3) 945-7755 <br />Denver Direct line: 893-1608 <br /> <br />Mr. J. William McDonald, Director <br />Colorado Water Conservation Board <br />State Services Building <br />1313 Sherman Street <br />Denver, Colorado B0203 <br /> <br />RE: Contract No. C153490; Union Avenue Boat Chute <br /> <br />Dear Mr. McDonald: <br /> <br />Pursuant to our Contract No. C153490 with the Colorado Water Conservation <br />Board, our report on the engineering feasibility of the Union A venue Boat <br />By-pass Chute was submitted on June 30, 19B7. <br /> <br />Review meetings were held with CWCB staff. the Urban Drainage District and <br />local government representatives. Your letter of September 1, 19B7 <br />outlined requested additions. <br /> <br />The June 30th report has been revised in accordance with recommendations <br />including drawings and cost estimates, for Alternate Nos. 4A and 5A. The <br />report date now shows September, 19B7. <br /> <br />Both alternates are feasible to construct and operate. Their costs are <br />similar to Alternate Nos. 4 and 5. <br /> <br />After your selection of the preferred alternate we are ready to proceed <br />with the design of the project. <br /> <br />Very truly yours, <br /> <br />WRIGHT WATER ENGINEERS, INC. <br /> <br />I <br /> <br /> <br />By <br />Kenneth R. Wright, <br />Chief Engineer <br /> <br />.E. <br /> <br />(9.27) <br />B31-036.080 <br />cc: Mr. N. C. Ioannides <br />Mr. David Walker <br />
The URL can be used to link to this page
Your browser does not support the video tag.